Greatmoor Incinerator
23rd March 2024
Our local incinerator, which we can see across the fields from our home, was doing open days. We had visited before in I think 2016. It was operational, but not complete, car parks, fencing, internal walls and conference rooms had not been finished. This was our chance to see it working in its completed form.
We met in the carpark, went to the conference room and got dressed in bright protective equipment. We were introduced to recycling; the burning of the rubbish was the last resort. We should be reusing, selling, recycling and finally when all options are gone, sending it to the incinerator to generate power.
We visited the control room where the systems were monitored, and the rubbish was loaded into the furnace. Next was a look into the furnace and then onto the generator. Power was sent to the national grid.
Finally, we stood under the condenser where the steam was turned back into water to be fed into the boiler.