We are having some electrical work performed in the house. New lights for the kitchen, along with a flat ceiling. At the same time we decided to have our power supply increased from 80amps to 100 amps.
This involves:
- changing the main fuse
- Updating the distribution box, we need an extra circuit breaker, and of course, you can’t purchase circuit breakers for the 30-year-old distribution box.
- Changing the meter tails from 16mm to 25 mm. Why are they called tails?
- Coordinating the electrician with the builder, so we don’t have holes in the lath and plaster ceiling for too long. Actually, this should be easy, as have worked on projects together for us.
So I messaged UK Power Networks, to change the fuse. They said I would need to get my supplier to change the tails first. Contacted Bulb, and they had Siemens come over to change the tails. The ideal chap, he could stand and work on the tails at over 7 feet up, without a ladder, steps or even a light.
Now I am waiting for UK Power Networks to come over and change the fuse, they do appear to have gone rather silent.